Trinchero Construction deploys advanced GPS and laser-guided technology on every earthwork project — delivering tighter tolerances, faster schedules, and measurable cost savings for South Bay public works.
Core Capabilities
From initial site preparation to final surface treatment — Trinchero delivers complete heavy civil packages across Santa Clara, San Benito, Monterey, and Santa Cruz counties.
Our flagship service. Real-time 3D machine control eliminates physical stakes entirely — reducing rework, accelerating mass earthmoving timelines, and delivering compaction accuracy unmatchable by traditional methods. Deployed on every major project.
Municipal roadways, parking lots, and public plazas engineered to exact compaction and mix specifications.
Sewer systems, water mains, French drains, and underground storm detention in constrained urban corridors.
Large-diameter pipe installation, deep excavation with steel trench shields, strict safety compliance.
Technology Edge
Trinchero was among the first South Bay contractors to adopt GPS and laser machine control. The same competitive advantage that defined Silicon Valley's tech industry has redefined how we grade.
Competitive Position
Local contractors compete on price. Trinchero competes on measurable operational precision — and wins work based on capability, not just cost.
| Capability | Trinchero Construction | DRYCO Civil | Typical Regional GC |
|---|---|---|---|
| GPS/Laser Stakeless Grading | ✓ Active | Limited | Not Available |
| Family Ownership — On-Site Management | ✓ Always | Corporate | Varies |
| Caltrans-Funded Public Works | ✓ Active | ✓ Active | Selective |
| Deep Trench Wet Utilities | ✓ Certified | Subcontracted | Not Available |
| Multi-County Regional Coverage | ✓ 4 Counties | 2 Counties | 1 County |
| 47-Year Established Track Record | ✓ Since 1977 | ~20 Years | Varies |
Project Portfolio
Class A license. GPS-equipped fleet. 47 years of local public works execution. Let's discuss pre-qualification.
Start Bid Request